Thought I should update everyone on the build so far. Pictures are hard to get up and running but its coming along. We now have power poles up, which means power is on its way. a well has been dug. 260' with 6 gallons per minute, thought that was pretty fantastic. We've got power and water lines to the building. We've got water/sewer/electric lines buried so when we're ready for the slab it can be poured. Septic tank, lines, and leach field have been approved. Driveway is getting the finishing touches this week and site work guys plan on moving out this week. Builder is still a little iffy on his start time but we're still being optimistic. Besides that I'll take some pictures hopefully this week so we can get some progress for people following us.

Thanks!