thanks guys, waynehere, it doesnot look like it in the pic but the top of the tube is better than 3'' down from the rail and nozzels are 6'' or better plus the inch of rail gasket on top to seal the pans to arch. i will get it insulated with blanket and brick when i move it to the new location[
610 taps on vac system,200 buckets 3x12 small bros raised flue
custom built aof gassification arch called the "cyclone"
1984 zetor 6045 4x4 tractor
cub cadet 4x4 utv
lots of old mm tractors
8640 john deere tractor (serious sap hauler)