Here is a thought I was having. I want to install AOF in my 2x6. I was thinking of putting the 2" tubing outside the arch and then run some 1/2" nozzles through the frame of the arch toward the fire. Any comments on this thought?
Here is a thought I was having. I want to install AOF in my 2x6. I was thinking of putting the 2" tubing outside the arch and then run some 1/2" nozzles through the frame of the arch toward the fire. Any comments on this thought?
220 Taps
2x6 Home made
Sap Shack 20x20
5 Shurflo diaphragm pumps
250 GPH Deer run RO
i believe some one did that with stainless tubing on here it seemed to work< the only thing is if you pre heat the AOF and tubing on outside you will want to insulate it so no one gets burned.
Some one said if you keep air flowing through the exposed tubing on inside it might not warp or wont, well I used steel tubing for like an oil fill tubes on a oil tank probably 1/4 thick maybe a little more and they warped.
Definitely insulating the tubing is key to longevity inside the fire box.
I'm going to start my 2x6 arch build this coming week, iv been like ADK been planing this for a few years im finally going to pull the trigger
Business Name
Flat Lander Sugaring (who would think a guy from Az be making syrup)
125 on Sap Suckers
Close to 475 High Vac
400 gravity adding more
leader 2x6
home made preheater
hoods
1 7D749 for AOF
New FLS Tsunami Arch
4 membrane TR Industries RO 2HP 3 phase 601GPH 250 PSI
PID Display for Arch Temp.
Chumlee of the trader