Tapped In Newport
Finished up today.
Sap was running a bit where the tree was in the sun.
Got the EEU fitted to the flue pan.
Now to get it piped in Wednesday, then I'll at least have a preheater.
Then I'll work on the blower and duct work after that.
Maybe have some sap to boil Saturday.
Dave
2x5 SS home design on a home design arch w/ forced draft
SS Evaporation Enhancement Unit
Home design filter / canner
Daryl Sheets filter press
300 taps (280 on line, 20 buckets)
120 gph Home Design RO
2017 Chevy Silverado w/ 275 gallon tank
8x16 sugarhouse w/ attached woodshed
A wife, family and friends that love to help!!