+ Reply to Thread
Results 1 to 2 of 2

Thread: 5/16 laterals not draining into 3/4"

  1. #1
    Join Date
    Aug 2018
    Location
    St. Johns, Michigan
    Posts
    101

    Default 5/16 laterals not draining into 3/4"

    I have about 40 taps on 5 laterals which are connected to 3/4" mainline with about 2% a grade over 400'.

    Walking the line today I noticed the drop lines and laterals are not draining, the temps are 39.

    Any idea why? The line has worked fine in the past.
    2022 - 157 taps, 40 gallons of syrup
    2021 - 171 taps buckets and tubing, 41 gallons of syrup
    2020 - 225 taps bags and tubing, 45 gallons of syrup
    2019 - 180 taps buckets and bags, 50 gallons of syrup
    Lapierre 2x8 Vision with reverse flow, hood & preheater
    Leader Micro2 RO
    Lapierre 10" short bank press

  2. #2
    Join Date
    Apr 2019
    Location
    Nashville, MI
    Posts
    942

    Default

    I think it was so cloudy today that it really never warmed up to what it was supposed to be at. See what happens tomorrow.
    2004 - 2012 2x3 flat pan 25 to 60 taps
    2012 2x3 new divided pan w/draw off 55 taps
    2018 - didn't boil surgery - bought new evaporator
    2019 new SML 2x4 raised flue high output evap. 65 taps
    made 17 gal. syrup
    2020 - only put out 53 taps - made 16.25 ga.l syrup
    2021 - Didn't work out
    2022 - 25 taps on bags / 8 taps on 3/16's line - late start

+ Reply to Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts