Here's a pic of the preheater SS pan on ledge(6"by 8" by 24") I built into OTE above flat pan with 1/2" valve to feed evaporator panIMG_20181024_104937851_HDR.jpg
Here's my grate I welded up and got the fire brick put in today, it's finally starting to look like something!!!
IMG_20181031_154302692.jpg
IMG_20181031_154130447.jpg