I have come up with a schematic for my plumbing plan. Any suggestions or streamlining would much appreciated. The 3-way valves A and B would allow me to off load from my truck and pump to my bulk tank, the first one valve A would allow me to pull from my transfer tank into my bulk tank and then flushed out via a hose valve B.

Plumbing schematic (2).pdf