I am going to run 600 taps on 3/16 into a mainline to the sugar shack a mile away. Little cheaper to run 3/4 than 1". Will this be big enough? Should i plug the end or keep it vented? Possible to add 200 or so taps down the line 1/2 way to the shack but will be a couple years out.