Results 1 to 7 of 7

Thread: Bricking & Pan contact ?

Threaded View

  1. #1
    Join Date
    Jan 2018
    Location
    Northern Vermont
    Posts
    65

    Default Bricking & Pan contact ?

    So we received our 18x60 drop flue evaporator from CDL. I cut & installed the ceramic board first. Then I cut bricks to fit the angles and allow for the grate to still come out easy. But I overlooked something..

    After I finished applying mortar and getting all the bricks in place i decided to take a measurement of the drop flue width vs the space between the bricks now that everything is place. The side of the outside flue is going to contact the bricks on the wall. Is this going to cause an issue?






    Sent from my iPad using Tapatalk Pro
    Last edited by EBG18T; 02-25-2018 at 12:48 PM.
    10’x16’ Sugarhouse
    18x60 CDL Drop flue Evaporator
    100 Taps on gravity

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts