    Still slowly, but still surely.




  2. #32
    Join Date
    Apr 2016
    Location
    Rutland, Vermont
    Posts
    326

    Default

    Looks awesome. You will enjoy boiling in the new building.
    CDL 2.5*8 Venturi with all the bells
    Leader Clear 5 bank filter press
    Memprotec 350H RO
    600ish taps and looking for more.

  3. #33
    Join Date
    Aug 2013
    Location
    WNY
    Posts
    471

    Default

    Not there yet, but looking into stack components. Oye. Not cheap. Tell me if I'm at least barking up the right tree. Looking at:

    -Pitched ceiling support kit, as this is a cathedral-esque install. Just open trusses up to the purlins. https://www.firesidechimneysupply.co...pport-kit.html

    -Add in a couple 4 ft sections of 8 inch class A pipe to go above the roof.

    -Selkirk chimney boot. I really like the idea of this thing. I feel like the rubber will do a better job of sealing off on top of the metal and the caulk will only help.
    https://www.amazon.com/dp/B007W84TKA...a-314846273744

    -Then add in a chimney support brace as it will be sticking up quite a ways.

    Thoughts on this? Will it work? I've poked around a couple websites and I'm in the $1,100 range.

    Update- I found all of the same items in amazon, total is like $750. Dang. I much prefer to support specialists, but that cost saving is difficult to ignore.
    Last edited by mudr; 09-20-2017 at 07:19 AM.

  4. #34
    Join Date
    Apr 2016
    Location
    Rutland, Vermont
    Posts
    326

    Default

    Quote Originally Posted by mudr View Post
    Not there yet, but looking into stack components. Oye. Not cheap. Tell me if I'm at least barking up the right tree. Looking at:

    -Pitched ceiling support kit, as this is a cathedral-esque install. Just open trusses up to the purlins. https://www.firesidechimneysupply.co...pport-kit.html

    -Add in a couple 4 ft sections of 8 inch class A pipe to go above the roof.

    -Selkirk chimney boot. I really like the idea of this thing. I feel like the rubber will do a better job of sealing off on top of the metal and the caulk will only help.
    https://www.amazon.com/dp/B007W84TKA...a-314846273744

    -Then add in a chimney support brace as it will be sticking up quite a ways.

    Thoughts on this? Will it work? I've poked around a couple websites and I'm in the $1,100 range.

    Update- I found all of the same items in amazon, total is like $750. Dang. I much prefer to support specialists, but that cost saving is difficult to ignore.
    When we built our sugar house last year we went with a roof jack from CDL that was bent to the pitch we needed. Same with the stack pipe. We didn't go with double wall.
    CDL 2.5*8 Venturi with all the bells
    Leader Clear 5 bank filter press
    Memprotec 350H RO
    600ish taps and looking for more.

  5. #35
    Join Date
    Aug 2013
    Location
    WNY
    Posts
    471

    Default

    Do you have a metal roof? If so, how did the roof jack seal to the contour of the metal?

    Sent from my SM-G900V using Tapatalk

  6. #36
    Join Date
    Apr 2016
    Location
    Rutland, Vermont
    Posts
    326

    Default

    The roof jack is made for the pitch of the roof. We have a 8/12 pitch, and yes we have a metal roof. It goes over the top of the roofing so it doesn't leak.
    CDL 2.5*8 Venturi with all the bells
    Leader Clear 5 bank filter press
    Memprotec 350H RO
    600ish taps and looking for more.

  7. #37
    Join Date
    Aug 2013
    Location
    WNY
    Posts
    471

    Default

    Concrete went in yesterday. 4 inch pad. Wire and fiber. 2 of the smaller 4 inch floor drains.

    My body has never felt this good after doing concrete work. Remember being more sore than this when we did some concrete pads for corn cribs growing up. Right now, it's only my hand that is sore from writing the check for the guy who did the pour. on an unrelated note, the concrete looks great!

    Sent from my SM-G935V using Tapatalk

  8. #38
    Join Date
    Aug 2013
    Location
    WNY
    Posts
    471

    Default

    Pleased with the finished product.

    Sent from my SM-G935V using Tapatalk

  9. #39
    Join Date
    Jan 2016
    Location
    hudson river valley
    Posts
    162

    Default

    Great looking slab for what looks like an awesome shack.
    2019-2023 40 to 50 taps to get 8 to 10 gallons of syrup
    2018 Built the sugar shack, produced 10.5 gallons (converted some to sugar,& cream). taps varied 45 to 50
    2017 Built 2x4 arch for a divided pan, 8.5 gallons from 30 taps increased to 42 taps during season.
    2016 Produced 3 gallons & 1 quart Syrup, Block arch & 3 buffet pans, 12 taps
    2015 Thought about tapping

  10. #40
    Join Date
    Jun 2011
    Location
    Northern Michigan
    Posts
    497

    Default

    Your sugarhouse is coming along nicely. I can understand how happy you are to get the concrete work done. You can be proud of your work, it looks really great. Although winter is coming, you should still have enough time to get the outside work done before the snow really starts flying. Keep up the great work.
    Gary
    16' X 24' Sugarhouse
    2' X 6' Leader Inferno Arch with Revolution Raised-Flue Pans, Smoky Lake preheater and hood
    Deer Run Maple gas-powered 250 RO
    WesFab 7" filter press
    Kubota 1100 RTV with tracks and 125 gallon tank for transporting sap
    800 taps on gravity and vacuum
    Very supportive wife who is the best coworker
    http://mapletrader.com/community/sho...ing-Sugarhouse

+ Reply to Thread