If the pump can handle the tap count and the releasers cycling then the answer is yes.

The issue is if both releasers dump at the same time...this will be the point that you will have the longest time to get back to the desired vacuum level.

I would certainly put check valve on the lines entering the releasers to minimize surging backup the mains into the bush

Over sizing the line to the furthest releaser will act as a balance tank and reduce frictional losses of the long distance.

Do not tee the line but use a Y connector to go to the second releaser to minimize frictional losses. Also using 2" or 3" pvc to Y of from will increase your efficiency.

With beg enough tools anything is possible...with in reason. lol