So the ongoing saga of my 16 season. Sugarhouse is done. Except for power. PSNH is coming to inspect next tuesday.
Today was get the woods tank in the woods and start running mainline.
I want to give a shout out to Jeff Moore of Windswept Maples. I hired Jeff to layout our mainline setup back in the fall. Then after the brief run Jeff and Brad came down and strung wire. I can't believe how much those 2 got done in a day. If you need maple services call these 2. I thought the price was well worth it.
Anyway today was fight with the dozer for longer then expected but it finally got going at noon. Got the tank out. And got the first 2000ft of pump line to the tank. Tomorrow is 2kft of vac line and maybe 2200 of wet/dry
If it wasn't for the last minute I wouldn't get anything done.
OH ya no evap still. Come on Cabin by the Creek its getting late!
d1.jpgd2.jpgd3.jpg