You should see the room now. We got the wall outlets in and the thermostat and zone valve control mounted. We got the plumbing at the outdoor wood boiler hooked up and hot water running in a loop into the addition. We also got the heater hung up and ready for the final wiring and plumbing. About the only things we still have to do is mount and wire in the lights and install the outlet for the RO.
Not a hijack at all Eric. I brought up the subject. I was expecting Brad to start his 2014 thread and tell us about it there but he didn't so I posted it here.













Reply With Quote