Working on final details in the sugarhouse. Got the VFD for the vacuum pump wired up running today and will be finishing up making all the connections to the cooling water and electric releaser tomorrow. Waiting for sap flow to get the transducer dialed in. Likely going to get some taps in on thursday and friday to test things out and get the vacuum system dialed in for when the sap really gets going. Forecast is not looking too favorable for any serious flow but could get enough to test the new rig. Bricking is done and now I just need to get the syrup pans back on and hook up the head tank. Had some friends over last week for beer and chili and talked them into helping lift the head tank to the second floor.
Woods are almost ready. Some more saddles to install and will install drops as I tap. Looking like the tap total will be about 550-600 this year. The new land has more maple that I had anticipated.