Woods work has started. And for the last few weekends we have been able to get things in order. Our new lease last year got 500' more of mainline to get us to the road side. I built and spray foamed insulated a new pump house. Green mountain power will be doing the service hook up later this week. Purchase a airtech pump for there, and will have an electric releaser.
The old woods we decided. Rip it all out and replace it all. Seems crazy this late to do. But man we made so good progress these last two weekends there. Bought a SS open tank for there and will build a roof for that will except the releaser so it's under the same cover. No power options there. So an airablo vac pump and mechanical releaser will do the job.hoping to get 1200 back online there.
Got lots still to do in sugarhouse as well, installing the air injection in the evaporator. And lots of cleaning of tanks ec.