ImageUploadedByTapatalk1374778172.104615.jpgImageUploadedByTapatalk1374778189.101002.jpgImageUploadedByTapatalk1374778211.902092.jpgImageUploadedByTapatalk1374778231.602039.jpg
Started a 12x16 with a 12x16 wood shed that will get covered next year.
ImageUploadedByTapatalk1374778172.104615.jpgImageUploadedByTapatalk1374778189.101002.jpgImageUploadedByTapatalk1374778211.902092.jpgImageUploadedByTapatalk1374778231.602039.jpg
Started a 12x16 with a 12x16 wood shed that will get covered next year.
2014 125 taps 16 gallons
2015 210 taps 49 gallons
2016 164 taps 75 gallons new 2X6 leader max flue and homemade AOF/AUF arch
2017 1500 taps 196 gallons RO added additions to building new tap lease
2018 1588 taps 276 gallons
upgrades for 2019 season 3 phase vacuum pump, stainless tank in woods, tubing replacement
Looks nice. What size evaporator is going in it?
Dave Klish, I recently ordered a 2x6 wood fired evaporator from A&A Sheet Metal which I will be converting to oil fired
Now have solar, 2x6 finish pan, 5 bank 7x7 filter press, large water jacketed bottler, and tankless water heater.
Recently bought another Gingerich RO, this one was a 125, but a second membrane was added thus is a 250, like I had.
After running a 2x3, a 2x6, 3x8 tapping from 79 taps up to 1320 all woodfired, now I'm going to a 2x6 oil fired and a 200-425 taps.
2014 125 taps 16 gallons
2015 210 taps 49 gallons
2016 164 taps 75 gallons new 2X6 leader max flue and homemade AOF/AUF arch
2017 1500 taps 196 gallons RO added additions to building new tap lease
2018 1588 taps 276 gallons
upgrades for 2019 season 3 phase vacuum pump, stainless tank in woods, tubing replacement
Finished the roof boards today and most of the trim!!!!ImageUploadedByTapatalk1375569545.916237.jpg
ImageUploadedByTapatalk1375569508.574307.jpg
2014 125 taps 16 gallons
2015 210 taps 49 gallons
2016 164 taps 75 gallons new 2X6 leader max flue and homemade AOF/AUF arch
2017 1500 taps 196 gallons RO added additions to building new tap lease
2018 1588 taps 276 gallons
upgrades for 2019 season 3 phase vacuum pump, stainless tank in woods, tubing replacement
Nice looking, See you got your wood close by!
Brian
Velvet Hollow Sugarworks
Greenwood, Maine
900 taps
CDL 2X6, leader RO
Nice looking shack, I am going to be building one this year also.
Built the door and brought in some fill now I'm waiting for the steel to come in to make it water tight!
2014 125 taps 16 gallons
2015 210 taps 49 gallons
2016 164 taps 75 gallons new 2X6 leader max flue and homemade AOF/AUF arch
2017 1500 taps 196 gallons RO added additions to building new tap lease
2018 1588 taps 276 gallons
upgrades for 2019 season 3 phase vacuum pump, stainless tank in woods, tubing replacement
Nice! I am building one this season as well I wish it was that far along.
Working on one now too. Will post pics soon. Very nice. Good work. Would love to see pic with steam out the cupola.
Fire wood chopper
Like the design, about to put the copala on my addition too. What dimensions did you go with. Particularly how wide and high. I know the goal is to have equal opening to pan size but how wide in the roof did you go. thanks
Half Pint, 44 taps, 16 chickens, pig pen
2014 2x4 Mason HO evaporator, 80-100? taps, 15 chickens, 2 pigs in the freezer keeping the frozen chicken company