I checked it out and I can easily add three inches to the length of the evaporator to add a fifth pan for sap warming. The only issue is that the pan would partially block the stove pipe entrance. Right now, there is 10.5 inches after the fourth pan for the heat to climb up and go out the full diameter of the stove pipe. If I add the fifth pan, only about 2” of the stove pipe would be fully exposed and only about an inch from the edge of the pan for the heat to go out the full diameter of the pipe.
If I do this, would it totally screw up my draft?
C65A9CE1-F7A1-4413-B545-568BE24B4090.jpg
31292247-6BD1-4FFB-8C8B-EE87AE51CE22.jpg