What do use to install long runs of main-line tubing?
We had a contractor use an Eagle Lasher to answer:
“Most recently we used on placing 1 inch vacuum lines for the production of maple syrup. The old way of doing it was slow: using hand twist ties it took all day to do 1000 feet. With the Eagle lasher we do 1000 feet in about an hour.
“Thanks DCD.”
Tom Sweeney,
TMT Contractors
For More Information:
-Video
-Brochure
-Blog Posting
If you feel the Eagle may be useful in your maple farm, please send us your feedback to sales@dcddesign.com or 1-888-794-8357