Custom Tubing Install
I am weighing the options in dealing with replacing an entire tubing system this fall.
Option #1. Do it all myself and will probably take 2 years to complete.
#2 Have the whole woods custom tubed.
#3 Hire only the surveying, i.e. layout done.
#4 Hire the surveying, layout, and mainlines and I do the rest.
I am asking: Does Leader or someone reputable do just the layout, marking, and or only mainline install? I am quite capable of installing the 5/16" lines and drops. I am having an issue with where to run the mainlines etc. I have quite a screwed up topographical woods and am interested in some professional assistance. If anyone has had only partial work done by a professional, I'd like to hear. Thanks. What is the cost for partial jobs? You don't have to be specific but a ballpark range.
Mark
Where we made syrup long before the trendies made it popular, now its just another commodity.
John Deere 4000, 830, and 420 crawler
1400 taps, 600 gph CDL RO, 4x12 wood-fired Leader, forced air and preheater. 400 gallon Sap-O-Matic vacuum gathering tank, PTO powered. 2500 gallon X truck tank, 17 bulk tanks.
No cage tanks allowed on this farm!