So its time to pull the taps.
I am looking for a way to pull each tap squirt some water / bleach soulution into the tap and plug the tap into the "T" .
I am thinking of a bottle with a 5/16 hole drilled into it containing the solution, pull tap, inset tap into hole give it a squirt and plug and move onto the next one.
Then dump a few gallons of the solution into the end of the 1" main line and let it run the full 1100 ft out the end.
Then seal up both ends of main line till next year?
Sound like a good plan? Will it do any good? How do you do it?

