Originally Posted by
minehart gap
Finally was able to get enough water to the building site to mix some concrete so this morning my cousin helped me mix and pour the pad for under the evaporator and two more post columns. It’s coming along. This Friday concrete should be done. Then bring the sawmill up to cut the siding. And the first day that the ground is frozen, bring the posts and beams up the hill. Then I should be set!
How smooth do you all like your concern floor? I used a mag finish so far but can change the rest without having it look too bad. I figured that I would want smooth but not slippery when it’s wet. Glass finish would most likely be like ice when something was spilled.