Originally Posted by
tuckermtn
walked the lines in the woods on thursday before things froze up- only have one section that has some chainsaw work to get a big pine top off it. Finished the RO room insulating today. Still lots of plumbing to do there- but need to figure my tanks out first.
hope to get floor of old woodshed poured into a slab before we get into full on winter- then will wait till spring to frame up the walls and shelves for the kitchen/canning area.
got four beer kegs on Monday- two 15.5 gal and two 7.5 gals. to tweek for syrup. getting closer...