-
Worked in the woods for a few hours only had probabsly 3/4 of a roll left and used that up started on the second mine for now i have 290 on my first mainline could have around 320 if i a ran a few mor lats i still have to do the taps that are passed my main that im going to put a star fitting on and run a few mor lats once i get my 3 mains done and then do the stars at the end of my mains last and should have 320 on one main and dont know yet on the thers quite yet.
-
will got the trap done today hooked up the vac pump turned it on it would only pull 2" of vac well on the phone with tech saport for 2 hours it has to be sent back to texas they will pay shipping good think the price was right or i be real P.O.
-
Jrthe- What are you going to do for a pump now? Are you going to have one for the season? Im working on all things syrup too. Cleaned a tank tonight. Plumbing tomarrow night for the sump pump in the sugar house. Need to clean more tanks. Hoping to plow out a spot for the tanker trailer this weekend. Im kind of thinking once season starts its going to be a break compared to getting ready for it. Gotta get some more taps in gonna be go time soon. Trying to make Parker proud of me by showing him that I WANNNNNNN IT!!! Zar
-
i not sure now all depends on how long it takes to get there and back and how long it takes them to fix it i found an old milker mite have to talk them out of it this is the last time i let a friend get me a deal on something through one of there friends
-
thinking one from matt looking better and better every day
-
Jrthe- He might be able to fix you up. Im not sure what all he has right now. Theron
-
Boyd-
You talking about going with the big tsunami sap vacuum?
2009 cut off for the season is coming right up.
I'm delivering one down that way in a few weeks.
-
what sizes and prices are we looking at
-
Holy Cow no one post anything since the 20th, well I just changed that.
I think everyone is over at Theron's Big Sap Warning posting!
-
ran 5000 feet of main yesterday, 3000 today then the fun part wire tieing