-
Holy cow Gravel! Sorry about the contract. You do have alot of tube in the air. You and Governor are getting serious. I thought you guys were just kidding. I can never tell if you guys are lyin or serious. I just automatically assume if your lips are movin your probly lyin. Wow. Keep me posted on progress. I thought I was doing ok down here but I wouldnt make a pimple on a good sugarmakers behind with acts like you guys to follow. Clipped in the inch and quata this morning. Holy criminy its cold. 16 degrees. Had to have duke blow on my fingers to thaw them out. Got it though. Working on the three quata tonight. Theron
-
Buffet was filling as usual. After this coming spring i'll have to bring up the 2500 taps of used tubing w/drops still on=50% rigid and 50% 4 seasons, and call in the troups and have a stringing up tubing wars=All i keep thinking about is we gotta get the other side of the mtn pipe up/gotta get the other side of the mountain strung up=BIGGERSAP, BIGGERSAP, BIGGERSAP.
I think the traveling RO trick like i told you would be what we'd have to do=go bush to bush and plug my RO into the pump house from the back of the trucks insulated box and send the permeate towards the Conn. river and the concentrate onto the back of the trucks tank. Unplug cords and move onto the next pick-up and do it all over again. Gonna work just as easy as nailing a coffin together :D
-
Snoop- Last week you we're lie telling, coperate merging, moose caller and now this week T-Sap is all sympathic= Sounds like trying to kissy kissy :). Maybe that video matt said was you was someone else? Whats the latest news in the obama caper? Last i heard was he still can't find it and has until Early Dec/which they will throw out another stall reason like my grandma burried it in a hole inside the bungalo we were in back in 64' and i'm going to get it soon if i can find the spot where we lived=is my guess.
There was a million dollar reward for a factual Obama live birth copy=Haven't heard if anyone has produced one yet=I figured that would have pulled the rabbit outta the hat for sure/But i heard the rabbit died-so trick over.
-
Right now the mainline is the equasion=under gunned BIGTIME. Looking at 1.5 and 2" material for sure with those distance's and Quanity of taps?? We'll get on that this coming spring/summer and hit 10,000+ next year with our hands ties behind our back with no problem and then have to put my 10,000 tap releaser there. I got more then enough pumps to at least get vacuum on the smaller bush's 1,000-3,000 taps.
Plan on building Pump plate's/Motor mounts for the Gas Engines and Pump heads this weekend for the 15-35 CFM pump heads. Got (2) new 6.5Hp Honda Clones setting in my basement waiting to be put in Service. Just ordered some centrifical clutch's the other day for the motor. Also got an 8Hp Tecumseh with about 25 hours on it for something?
How many Vac. pumps do you need this year? Probably have the 4,000 taps releaser you could use too/Just need to make sure it works right. I'll bring that home and test it out in my vacuum experiment station in my garage and let you know.
GAME ON. Here is the coin toss...
-
(3) 3/4" mainline will get those 1,000 across the road/Won't even need a dry.
-
Just made a batch of Maple Mustard to restock the shelf. Not sure where the last batch went. More Maple BBQ to make tomorrow night, also some Honey mustard for a order. Sales have picked up a little as the holidays approach too.
Chris
-
Double wet and dry was my thinking with the amount of taps/but i need to walk the other side of the bowl to get a good accessment of the taps=looks like 8-10,000 and i know just by the looks of the tree tops that there is at least 7500 in there mininum. When you asked me how many taps? And like i said i could see 2500 taps from just where we were standing on monday talking and that was a little over 1/4 or the woods area he owns from what you said he does. It's a cocker for sure to have access to all those taps.
-
Moving tanks this weekend. Got the lines all ran across the road for the releaser over there last night. Only main over there to do know is the trunkline dry. Going to do that tonight. If I get the tanks all done this weekend I should be down to putter work. Some mainline connetions drops and saddles mostly. Looking foreward to a break. Ready to have everything done as soon as I can. Then Im kind of hoping it doesnt run till Feb but whatever if it runs were gettin it. My main objective this year is to fill as many drums as possable. May do some work to make the bucket bush possable. Would like to get out maybe 1100 buckets if possable. Cant beat a bucket on a good run day. MORE SAP IS ALWAYS BETTER! Theron
-
Ya- I'll check it out in the near future=we'll find a day to go and look it all over fine tooth comb style. Driving down the road and looking at the 1,000 will cross the road pretty easily with some pipe and maybe vacuum magic. lol
-
sounds like you guys will need to hire a full time OILER to keep things running
RICH