mapleack
08-01-2010, 02:16 PM
I want to add vacuum to another section of woods this year. There are currently about 200 taps in place in this location, with potential for about 500 total. The existing taps are in with 3/4 mains that tie to a central collection point. To get vacuum there I'm looking at running about 1,200' of pipe from a new tank / releaser point up the hollow to the existing tubing. The 1,200' is on about a 3% grade. My question is: I want the mainline to be blue tubing, so would I be better off to run a 1" wet / dry system and use blue for the wet and black for the dry, or run a single 1.5" blue wet line only. Other than the extra labor, the cost for either option is pretty close, I just want to the do it right for the best sap production when I've expanded the area to its potential. Thanks!