SeanD
11-06-2009, 08:26 AM
I'm planning on running my stack through the peak by cutting the ridge beam out between two rafters (24" o.c.) and framing an opening so that the stack has as much heat clearance as possible. I am planning on only sheathing with plywood on the roof up to the framed opening so that only the metal roofing (that will be on top of the plywood) extends past the sheathing up to the stack.
Am I creating a problem where some of the moisture from inside the shack can now get up against the exposed metal roof around the stack, condense and run down the roof between the sheathing and the metal roofing?
Thanks in advance. Pics on the way.
Sean
Am I creating a problem where some of the moisture from inside the shack can now get up against the exposed metal roof around the stack, condense and run down the roof between the sheathing and the metal roofing?
Thanks in advance. Pics on the way.
Sean