SeanD
03-27-2008, 07:08 PM
I still have one more boil for this season, but I can't help thinking about how I want to reconfigure my set up for next year. I'll probably add dividers to my 2 x 3 flat pan and two threaded nipples on either side of the last section to draw from. So I'll need openings in both ends of the dividers so that I can reverse the flow to draw from the opposite side.
My question is, how do people close off the openings in the dividers so that the sap runs the length of the section and heads to the intended opening at the opposite end? I'd appreciate any pictures too if possible.
Thanks,
Sean
My question is, how do people close off the openings in the dividers so that the sap runs the length of the section and heads to the intended opening at the opposite end? I'd appreciate any pictures too if possible.
Thanks,
Sean