bryankloos
03-19-2023, 05:24 PM
Hello All,
Please help me with the next step.
I used a small pump to run one-step solution from my collection manifold up through the laterals to the last check valve spout on the lines.
I then worked my way down the lines pulling taps and flushing the drops. All CVS were then plugged into the Tee.
The entire run now has one-step solution in it, soaking.
Here is the question...
Should I drain the lines and let them dry after a couple days soak?
Should I cut off the CVS or leave them on until Fall?
Should I leave the system with solution in the lines and wait until Fall to do anything?
Next season I plan to replace the CVS and reuse all the Tees and lines.
Toughts?
Thanks,
Bryan
Please help me with the next step.
I used a small pump to run one-step solution from my collection manifold up through the laterals to the last check valve spout on the lines.
I then worked my way down the lines pulling taps and flushing the drops. All CVS were then plugged into the Tee.
The entire run now has one-step solution in it, soaking.
Here is the question...
Should I drain the lines and let them dry after a couple days soak?
Should I cut off the CVS or leave them on until Fall?
Should I leave the system with solution in the lines and wait until Fall to do anything?
Next season I plan to replace the CVS and reuse all the Tees and lines.
Toughts?
Thanks,
Bryan