I'm bricking a new CDL drop flue evaporator with 5 inch flues
my question is do i just need to brick the fire box and use arch board for the rest of the evaporator?
I laid out the arch board and brick on the part under the flues and set my pan down and
there is not enough depth with the brick. should i use vermiculite on top of the arch board or is the arch board sufficient
thanks