mol1jb
06-06-2018, 05:28 PM
So today was day 2 of installing a new 3/4" main in the bush for 150 taps. This main replaces 6 runs of 3/16 line 400ft long. I am also adding 4x more runs of 3/16 for next season so I figured 10x runs would be too much maintenance if my squirrels get hungry. It was challenging because I was running it at the bottom of the ravine that made several hard jogs left and right. I had 3x 90* turns and 2x 45* turns. There really wasn't much tension I could take up before I had to side tie. I also had to side tie quite a bit to keep good tension throughout the run with all the jogs back and forth. On my first try 2x of my side ties on the 90* turns broke with too much pull on them so I had to change all 3x 90* side ties from 14 ga to 12 ga to keep from breaking. I think it is pitched well but there is one creek crossing that is my only questionable spot. It spans close to 75ft and has just a bit more sag than I prefer. Maybe I will take a pitcher of water out tomorrow and pour it in the top side of the main to identify any trouble spots.