Urban Sugarmaker
11-17-2017, 06:23 PM
I am "hosting" a brand new CDL 2 x 6 classic evaporator for next season. Long story but I jumped at the opportunity to have a new rig at my place. It wanted to be used and its owner won't have a sugar house built for a while. I can hardly wait to move it with bricks in it some time in the future. Ugh.
Anyway, I have some questions:
1) How long should the mortar cure before a test boil. The weather has cooled so I will be using light bulbs to help keep it warmer while it cures.
2) Should the stack pieces be secured with screws at each joint? Do I need to secure it with cables above the roof? Probably 1.5 4' sections above the roof penetration point.
3) Anyone have a picture of how to hook up the cables for the stack cap?
Thanks
Anyway, I have some questions:
1) How long should the mortar cure before a test boil. The weather has cooled so I will be using light bulbs to help keep it warmer while it cures.
2) Should the stack pieces be secured with screws at each joint? Do I need to secure it with cables above the roof? Probably 1.5 4' sections above the roof penetration point.
3) Anyone have a picture of how to hook up the cables for the stack cap?
Thanks