Here's my setup: I have an extended barrel arch, with the equivalent of 4 full size steam pans. Actually, going from the door end to the stack end, I have 2 half-size pans (side by side), then 2 more half-size pans, then full size and another full size. I have had some success using siphons, and will tweak them to try to improve them some more, but have been successful in getting a continuous flow. I have always batch boiled (even when getting the continuous flow going), which pretty much eliminates weekday evenings, because the start up and shut down take so long. I'll be set up under a canopy.
I'd like to try doing a continuous flow with draw-offs, so I don't have to get set up, take down and clean everything every time I boil. I'm looking for ideas on how to make it work.....such as maybe building a hood or cover, and anything else I need to know. I'd really like to get in some shorter boils on weekday evenings (say 3 to 5 hour boils) instead of just the marathon Saturday and Sunday 14 or 16 hour boils (it's not a good thing when you realize Sunday has turned into Monday morning, it's 2 AM, you need to be at work at 7 AM, and your rig is still boiling).
Maybe soon I'll be able to spring for a hybrid pan and increase my boil rate, and build a shack too.....but my funds are limited and the code administration in the municipality in which I live is known for being difficult. So this is what I'm stuck with for the near future, at least this season
Any ideas and/or help would be appreciated.
Thanks.
I'd like to try doing a continuous flow with draw-offs, so I don't have to get set up, take down and clean everything every time I boil. I'm looking for ideas on how to make it work.....such as maybe building a hood or cover, and anything else I need to know. I'd really like to get in some shorter boils on weekday evenings (say 3 to 5 hour boils) instead of just the marathon Saturday and Sunday 14 or 16 hour boils (it's not a good thing when you realize Sunday has turned into Monday morning, it's 2 AM, you need to be at work at 7 AM, and your rig is still boiling).
Maybe soon I'll be able to spring for a hybrid pan and increase my boil rate, and build a shack too.....but my funds are limited and the code administration in the municipality in which I live is known for being difficult. So this is what I'm stuck with for the near future, at least this season