Tidajo
01-25-2015, 01:02 PM
Trying to do an arch rebuild on the cheap, was agonizing the 16" oval to 8" base stack problem.
I found something at the box store, and had an idea that I haven't seen here.
It took me an hour to make the base stack.
I used a floor register with 8" round output.
Is this as easy as it seems, or am I missing something? the gauge is a little light, but I figure I'll pack ceramic blanket in it.
What do you think?
10438 10439 10440
1044110442
I found something at the box store, and had an idea that I haven't seen here.
It took me an hour to make the base stack.
I used a floor register with 8" round output.
Is this as easy as it seems, or am I missing something? the gauge is a little light, but I figure I'll pack ceramic blanket in it.
What do you think?
10438 10439 10440
1044110442