tonka
01-11-2015, 03:42 PM
The new arch I am making that will accommodate the new pans when I get them all welded up, a 4x8-11" drop flue pan with 2 syrup pans out in front. The fire box is 3 foot deep, and the ramp is also 3 foot, I plan on getting some 2" square to put on top of rails so I have the option to have AOF installed. It will be lined with arch board and then fire brick. Still have some reinforcing to do and installing some adjustable legs, just the beginning!! 1030110302103031030410305