heus
05-10-2012, 07:25 PM
Brought home the rest of my new 2.5x10 A&A evaporator today. Here are some fuzzy camerphone pictures of it. Evaporator is in its temporary location while I pour concrete pads. It is a soldered raised flue with 3 foot syrup pan and 7 foot flue pan. Everything is stainless (arch, stack, etc) and it has an airtight front. My initial thoughts on this rig:
1.It seems pretty solidly built.
2.Not shiny like my last rig but I knew that when I ordered.
3.I like that the arch is made for a raised flue. No need to fill with sand or vermiculite like my last arch.
4.It came with the ducting into the back of the firebox already there. I didnt expect that.
5.It came with both firebrick and blanket. I thought I was only getting one or the other with the deal.
I cant wait to get it installed and have a test boil. That probably wont be until mid to late summer. I was not prepared for it to get here so quickly.
1.It seems pretty solidly built.
2.Not shiny like my last rig but I knew that when I ordered.
3.I like that the arch is made for a raised flue. No need to fill with sand or vermiculite like my last arch.
4.It came with the ducting into the back of the firebox already there. I didnt expect that.
5.It came with both firebrick and blanket. I thought I was only getting one or the other with the deal.
I cant wait to get it installed and have a test boil. That probably wont be until mid to late summer. I was not prepared for it to get here so quickly.