SilverLeaf
03-08-2011, 11:46 AM
For those of you out there that use dumping stations and then let gravity drain the sap from there to your collection tank, how much slope in the line would you need between the dump station and the collection tank to make it work? (Assuming, of course, no sag in the line). Could it be done with 3% slope (or less?). Or would the flow slow down to such a trickle at this slope that it would be impractical?
I don't have a hill to work with here. Just trying to shorten the bucket-carrying distance for some of my farthest-flung trees. I think I could rig something up with 2-3% slope.
I don't have a hill to work with here. Just trying to shorten the bucket-carrying distance for some of my farthest-flung trees. I think I could rig something up with 2-3% slope.